Plant Firewater System
This project involved the installation of a firewater delivery system over an extensive distance on a large power producers plant and mine site. The installation required conventional trenching, Hydro Excavating, as well as directional drilling. The installation included HDPE pipe which was fused in place, hydrant installations, thrust blocks, as well as the welding and installation of pipe sleeves in heavy traffic areas.